City of Fayetteville header
 logo bottom
Select Your Information Portal:
Section Navigation
Residential Rental Property Program
 
Recently Added Files
>>> All Section Files >>>
 
Contact Us

City Hall
433 Hay Street
Fayetteville, NC 28301
910-433-1FAY(1329)

Ask a Question

Report a Problem

General Comments

 
Quick Links
Code of Ordinances
 

Kaleidoscope

PWC

City Council Meetings
Mechanical
Mechanical

Underground
To be made after trenches or ditches are excavated and bedded, piping installed, and before backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks and other rubble, which would damage or break the piping, or cause corrosive action, clean backfill shall be on the job site.

Rough-In
To be made after the roof, framing, fire stopping and bracing are in place and all ducting and other components, which may be concealed, are complete, and prior to the installation of wall or ceiling finish material.

FINAL
To be made upon completion of the mechanical and/or gas piping systems.

NOTE:
Before any system of gas piping is finally put in service, it shall be carefully tested to ensure that it is gas tight. Where any part of the system is to be enclosed or concealed, this test shall precede the work of closing in. To test for tightness, the piping shall be filled with air or inert gas. Oxygen shall never be used for this test.

Click Here to download an application for a mechanical permit (pdf file format)

  
The Award Winning Fayetteville Focus E-newsletter : Subscribe Today
Events RSS FeedUpcoming Events
 
 
Hometown Views
fascinateu.jpgncvp_hand.jpg
 
 
 Rights and use information  |  Privacy policy  |  City Employee E-mail Login  |  2nd Public Safety E-Mail Server  |  Website Accessibility  |  ADA Compliance  |  Contact us
433 Hay St. Fayetteville, NC 28301, (910)433-1FAY © 2005-2012 City of Fayetteville, All rights reserved.